Wide aerial view of a massive cable-stayed bridge spanning a deep river gorge, shot from above and slightly right-of-center under sharp midday sun, structural cables casting geometric shadows across the concrete deck, vast sky above and dense forest below, emphasizing scale and engineering precision
Wide aerial view of a massive cable-stayed bridge spanning a deep river gorge, shot from above and slightly right-of-center under sharp midday sun, structural cables casting geometric shadows across the concrete deck, vast sky above and dense forest below, emphasizing scale and engineering precision

Built. Delivered. On Record.

Every entry here is a finished, occupied, or commissioned structure. Organized by project type and scale so you can confirm fit in one scroll.

140+

$18B+

96%

30 yr

Structural delivery experience across public, municipal, and private sectors.

Completed projects across bridges, towers, and mixed-use infrastructure.

Total contract value delivered across North American markets since 1994.

On-time completion rate across all contracted project deliveries.

Head-on ground-level view of a wide concrete arch bridge over a major river, sharp midday light casting strong shadow under the arch, clear blue sky, urban context visible at both banks
Head-on ground-level view of a wide concrete arch bridge over a major river, sharp midday light casting strong shadow under the arch, clear blue sky, urban context visible at both banks
Wide environmental shot of a completed 52-story glass-and-steel commercial tower photographed from street level, sharp golden-hour side light emphasizing curtain wall geometry and structural grid, clear sky
Wide environmental shot of a completed 52-story glass-and-steel commercial tower photographed from street level, sharp golden-hour side light emphasizing curtain wall geometry and structural grid, clear sky
Aerial view of a completed highway interchange with multiple elevated ramp structures, photographed straight down from above, midday sun, precise geometric shadows of concrete piers on asphalt below
Aerial view of a completed highway interchange with multiple elevated ramp structures, photographed straight down from above, midday sun, precise geometric shadows of concrete piers on asphalt below
Wide shot of a completed mixed-use development block with ground-floor retail podium and two residential towers behind, photographed from across the street at eye level, sharp afternoon light, occupied and active
Wide shot of a completed mixed-use development block with ground-floor retail podium and two residential towers behind, photographed from across the street at eye level, sharp afternoon light, occupied and active
Ground-level wide angle of a municipal water treatment facility, large concrete basin structures visible, crisp morning light, no people, geometric forms and precise construction joints emphasized
Ground-level wide angle of a municipal water treatment facility, large concrete basin structures visible, crisp morning light, no people, geometric forms and precise construction joints emphasized
Wide environmental photograph of a completed light rail transit viaduct stretching across an urban valley, photographed from the end of the alignment, golden-hour light, steel deck and concrete piers sharp against clear sky
Wide environmental photograph of a completed light rail transit viaduct stretching across an urban valley, photographed from the end of the alignment, golden-hour light, steel deck and concrete piers sharp against clear sky

Completed Projects by Scale

Queensboro Crossing Bridge

One Meridian Tower

Route 7 Interchange Complex

Post-tensioned concrete arch. $340M contract. 26-month delivery. 1,800 ft main span.

Composite steel frame, 52 floors. $620M contract. 38-month delivery. LEED Gold certified.

Cast-in-place concrete. $185M contract. 18-month delivery. 6-lane capacity, 4 ramp structures.

Harborside Mixed-Use District

Eastside Water Treatment Plant

Midline Rail Viaduct

Reinforced concrete podium, dual tower. $890M contract. 44-month delivery. 1.2M sq ft total.

Pre-stressed concrete basin system. $210M contract. 22-month delivery. 40 MGD capacity.

Steel box girder on concrete piers. $460M contract. 31-month delivery. 3.4 km elevated alignment.